Civil Works - Footpath, Kerb and Gutter - Belfield

Strathfield Council has engaged Planet Civil Pty Ltd to undertake reconstruction of footpath, kerb and gutter including driveway layback along Birriwa Avenue, Belfield. These works involve re-construction of footpath to eliminate the trips and re-construction of kerb and gutter works on both sides as required.

During the works, the affected areas will be barricaded and signposted accordingly and it is imperative that these arrangements are adhered to at all times. Therefore, the highest level of safety for pedestrians and vehicles are maintained.

 

When: Monday 3 December - Friday 21 December (weather permitting)

Work Hours: 7.00am - 5.00pm

Where: Birriwa Ave, Belfield